The bathrooms were (supposedly) finished today because the grout was done. But when we went to look, the tiling isn't actually complete. There is lots of fiddley cutting in that still needs to be done. So still messy stuff plus more plumbing too. This pic is the feature wall tile and shower in our ensuite. (This is the shower I wanted for our downstairs bathroom and I couldn't have...Everything comes to she who waits :)
Picture of our spa bath. It's a double, and still needs the panel and step fitting to the side. As you can see, it doesn't quite fit (bit short)...but still, at least it made it into the bathroom in one piece. The bath taps/spout is also the one that took an extra month (on top of the 4 months) to source and deliver.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment