We have had major headaches with the bathrooms. Firstly, after the plumbing and waterproofing was finished, the plumber checked the tech specs of the bath that arrived from Germany and found the floor waste is not quite right and the drain needed recutting and therefore the waterproofing guy needed to come back.
Then the bath in the kids room needed a special frame which wasn't delivered so this put us further back because the tiler won't start until everything is ready as he wants to hit both bathrooms at once. The recess for shampoo etc has been cut and will be tiled with the mosaics.