Thursday, August 14, 2008

inside and out

This is the internal courtyard area - the holes in the bricks are for a water feature. Downpipes and cladding of open gable of 'old' roof is now complete. Still need to do soft linings and eaves. The whole areaalso needs waterproofing and the rain-water tank needs to be installed and concreted over. This window looks into hallway and 'open-sided' family-room.

Another area that is now ready for waterproofing is our ensuite. Pictured here the louvered windows and main window with walls ready for tiling.