Tuesday, July 29, 2008

kitchen


Joinery contractors are stopping in for a final site measure tommorow then locking into workshop. Aiming for 1st wk September to install. Timing should work well with other trades, finishes (etc). The only finish that hasn't been finalised is the bench tops. We are going with a caesar stone but want to see a bigger sample of Latte, Cashmere and Ginger in order to finalise. He will have these available by end of week. This will not hold things up as he can start with carcass etc.

Summarising finishes, we have woody grain looking veneer for overhead cupboard, white poly below bench drawers, benchtops as mentioned above. Mentioned routing in draining board and bin drawer. Decided to keep wine rack as is and making cross pieces / rack etc a feature with the same veneer as overhead cupboards. We have plenty of room in cupboards for spirits so no need for a separate spirits cabinet.

Behind the red wallon the right is the walk in pantry. To the left of kitchen are the windows overlooking the pool.

No comments: