Baths and water

This week we have been discussing plans for the two upstairs bathrooms. We want to have a double spa bath in the ensuite and a big a bath as possible for the kids bathroom too. Going with the Duravit brand and a bath with a wenge coloured panel for us. However got told there is minimum 12 week lead times for some items as must be ordered from Italy! There goes our project deadline sliding along again. Jury still out on tile colours.

Also discussed carpets for upstairs and whether or not to carpet the staircase or leave wooden. I think carpet.

Still waiting for stormwater drawings to submit to council.

Trying to get to window contractor this week to discuss and negotiate. Even though most windows need be site measured hoping he can order framing material, powdercoat etc so when ready he can hit it.