Monday, June 16, 2008
more rain

Wednesday, June 11, 2008
Bricks

The courtyard is also poured and bricked (above), complete with fish pond (apparently!)
Sunday, June 08, 2008
flooring and roofing


This picture shows insulation which means roof is on the backpart of the house now.
Friday, June 06, 2008
Washout

However, the gyprocker was able to get the stud walls underway and the window guy came and measured up for the downstairs windows. He gave us some advice about having a serving hatch through the kitchen window to the back. The advice was 'don't do it'. Because there is no planned (at this stage) roof structure for the back patio, the window will be open to the elements and there would undoubtedly be leakage. Fair enough. So three weeks today he'll be ready to install. But will the walls be built? If the rain keeps up, then no! He'll be back next week, or when we have some flooring to measure upstairs.

We also have both floors laid now (basic boards, not finished ones). which means the structure finally looks like a house! The top picture is the second storey, covered in plastic.
Hoping to get the roof on over this weekend but the weatehr forecast doesn't look good. More rain apparently.
Subscribe to: